FOI 2996 Asbestos

The response to your query is detailed below:  We have been able to

deliver parts 3,4 and 5 of your request but not parts 1 and 2.  From our

preliminary assessment listed below, we estimate that compliance with your

request would exceed the appropriate costs limit under section 12 of the

Freedom of information Act 2000. This is currently £450.

Question 1

“Copies of all asbestos surveys for the Heartlands/East Birmingham

Hospital (including but not limited to the Yardley Green site and Arden

Lodge”

Information not provided on the grounds of cost exceeding £450 and time to

compile information exceeding 18 hours, as per justification below;

Labour costs

4,160 A4 pages of information in total comprising a mixture of loose leaf

and bound pages

Time to extract, unbind, copy, re-bind and file 4,160 pages of surveys =

27.7 Hrs

Band 3 Clerical Assistant (£17,794pa) = £9.12/Hr

Labour costs = 27.7Hrs x £9.12/Hr = £252.62

Stationery costs

£2.17 per 500 A4 sheets of paper

Paper Costs = 4,160/500 x £2.17 = £18.05

Folders, sleeves, etc = £20

Stationery costs = £38.05

Printing Costs

£0.05 per black & white print

£0.21 per color print

Assuming 3% of original pages/plans require colour printing then,

Colour print cost = 4,160 x 0.03 x £0.21 = £26.21

Black & white print costs = 4,160 x 0.97 x £0.05 = £201.76

Printing Costs = £227.97

Total Cost to produce information request No 1 – £518.64

Question 2

“Copies of all records, plans, surveys, correspondence and memoranda

regarding the removal of asbestos from premises (including but not limited

to the Yardley Green site and Arden Lodge”

Information not provided on the grounds of cost exceeding £450 and time to

compile information exceeding 18 hours, as per justification below;

Costs for Heartlands Hospital and Yardley Green sites only (does not

include Chest Clinic, Solihull or Good Hope hospitals)

Labour costs

6,240 A4 pages of information in total comprising a mixture of loose leaf

and bound pages

Time to extract, unbind, copy, re-bind and file 6,240 pages of information

= 41.5 Hrs

Band 3 Clerical Assistant (£17,794pa) = £9.12/Hr

Labour costs = 41.5Hrs x £9.12/Hr = £378.48

Stationery costs

£2.17 per 500 A4 sheets of paper

Paper Costs = 6,240/500 x £2.17 = £27.08

Folders, sleeves, etc = £30

Stationery costs = £57.08

Printing Costs

£0.05 per black & white print

£0.21 per color print

Assuming 3% of original pages/plans require colour printing then,

Colour print cost = 6,240 x 0.03 x £0.21 = £39.31

Black & white print costs = 6,240 x 0.97 x £0.05 = £302.64

Printing Costs = £341.95

Total Cost to produce information request No 2 – £777.51

Question 3

“Details of the contractors used for asbestos removal”

Contractors used for asbestos removal works at Heartlands Hospital and

Yardley Green sites only (does not include Chest Clinic, Solihull or Good

Hope hospitals)

A.J.Mills & Sons Limited

Lagfast Insulation Services Limited

J.Cullen Thermals Limited

ICL Limited

Asbestos Abatement Services Limited

Asbestech Limited

Coleman & Company Limited

Forrest Environmental Limited

Central Insulation & Environmental Services Limited

DSM Demolition Limited

ICS Limited

Question 4

“Details of all contractors employed to work on the premises at the

Yardley Green site and Arden Lodge from 1983 to date (including but not

limited to details of the contractors responsible for the demolition and

site clearance).”

Contractors used for asbestos related works only at Yardley Green site are

listed below (does not include Chest Clinic, Heartlands, Solihull or Good

Hope hospitals). A list of contractors used for all other works at Yardley

Green site from 1983 is not available.

A.J.Mills & Sons Limited

Lagfast Insulation Services Limited

J.Cullen Thermals Limited

ICL Limited

Asbestos Abatement Services Limited

Asbestech Limited

Coleman & Company Limited

Forrest Environmental Limited

Central Insulation & Environmental Services Limited

DSM Demolition Limited

ICS Limited

DMW Environmental Safety Limited

Management UK Limited

YJL Environmental Services Limited

YJL Construction Limited

OHS Limited

Envirocare Limited

Midland Environmental Laboratories

Birmingham City Laboratories

Industrial Research Laboratories – City of Birmingham Engineers Department

DMW Environmental Consultants

Tersus Limited

Monitor Environmental Limited

Bradley Environmental Limited

Envirocare Midlands Limited

Ownership of Arden Lodge and part of the Yardley Green site transferred

from HEFT to North Birmingham Mental Health Trust prior to the demolition

of Arden Lodge.

HEFT does not have any records associated with the demolition of Arden

Lodge because this work was conducted on behalf of North Birmingham Mental

Health Trust and not HEFT.

Question 5

I attach the last two years of minutes from the Asbestos management group.

AMG Notes 9.1.14 AMG Notes 11.10.13 AMG Notes 18.4.13 AMG Notes 27.6.13 AMG Notes 29.1.13 AMG TofR(updated) AMG Minutes 8.11.12 AMG Minutes 10.10.12 AMG Minutes 15.5.12 AMG Minutes 20.6.12 AMG Minutes 28.8.12 AMG Minutes 30.7.12 AMG Notes 6.12.12 AMG Notes 8.3.13